Generation Anthropocene
The New Mexico facility is due to be sealed in 2038. The present plans for marking the site involve a berm with a core of salt, enclosing the above-ground footprint of the repository. Buried in the berm will be radar reflectors, magnets and a “Storage Room”, constructed around a stone slab too big to be removed via the chamber entrance. Data will be inscribed on to the slab including maps, time lines, and scientific details of the waste and its risks, written in all current official UN languages, and in Navajo: “This site was known as the WIPP (Waste Isolation Pilot Plant Site) when it was closed in 2038 AD … Do not expose this room unless the information centre messages are lost. Leave the room buried for future generations.” Discs made of ceramic, clay, glass and metal, also engraved with warnings, will be embedded in the soil and the shaft seals. Finally, a “hot cell”, or radiation containment chamber, will be constructed: a reinforced concrete structure extending 60 feet above the earth and 30 feet down into it
via http://www.theguardian.com/books/2016/apr/01/generation-anthropocene-altered-planet-for-ever